Dubai Municipality Approval

Category: DUBAI APPROVALAuthor: HOME

Dubai Approvals Team is a licensed engineering company in Dubai that provides you with the best engineering solutions to get easy Dubai Municipality Approval for offices, restaurants, cafeterias, etc. Our team of experts will ensure you'll have the Dubai Municipality Approval, also known as DM Approval, for your offices, restaurants, or warehouse as soon as possible without any kind of fuss. You can also consult our experts if you are having any problem with getting other related Approvals from Dubai Municipality. Our services are available all the time of year throughout the state of Dubai.

 

 

What is Dubai Municipality Approval?

Dubai Municipality, or DM, provides approval services for building permits and other licenses for new buildings and redevelopments of existing buildings. Any private and government entities, individuals, and businesses with proposed building plans can benefit from this service and get approval form DM for their projects. The approval service can be acquired for proposed drawings and plans of developmental projects in the jurisdiction of DM. Some of the various types of projects that are covered under this service include single- and multi-story buildings, industrial structures, villas, and floor-to-floor ratio areas. The Dubai Municipality approval assures that every project complies with the standards and guidelines of the authority; if not, no physical work should be initiated.

 


 

Why Choose Dubai Municipality?

Office Approval

As per the law of Dubai, Dubai Municipality, or DM Dubai, corroborates the process of approving the offices to be established in the Dubai region. There are various requirements and documents that need to be submitted before you can get any Dubai municipality approval. The first thing that may be put into inspection by the Dubai Municipality is the building in which the office is to be set and the purpose of the office. Dubai Municipality will cross-check the legality of the building and the purpose of the office before going to other documents.

Restaurant Approval

Getting Dubai Municipality's approval for a commercial, such as a restaurant, can be quite a daunting task. We are a licensed engineering company that provides you with the layout to get approvals from the DM authority, such as the Food Control Department Dubai, for DM approval. Without the final approval from the Food Control Department, the restaurant cannot start business.

Some of the basic prerequisites to get restaurant approval are as follows:

The floors and the ceiling should be easily cleanable. It should have a proper drainage system, and the materials used to build the restaurant should be fireproof, light-colored, smooth, and non-toxic.

  1. The restaurant should have proper lighting and ventilation system.
  2. The restaurant should also obtain a pest control contract from an approved pest control company.
  3. The drainage connection, as well as the water connection, should not be visible outside.
  4. The chimney duct in the restaurant must be at least 2m higher than the nearest building.
  5. All the tables used should be stainless.
  6. Cleaning chemicals should be stored in a separate room.

Along with these office and restaurant approvals, we provide you with the best engineering options for your warehouse mezzanine.

 

DM Approval for Building and Construction Services

  1. Approval to Demolish or Delist a Building in the Historic Areas
  2. Existing Building Evaluation according to Dubai Universal Design Code (Wosool)
  3. Sand Transfer Permit
  4. Self-Decor Permit
  5. Completion and Service Connection
  6. Structural Inspection
  7. Boundary Wall or Fence Permit
  8. Approval for Building Completion Certificate with Dispute
  9. Building Modifications or Additions Permit
  10. Design and Permit Service Blocks in Private Villas
  11. No Objection Certificate for Infrastructure Projects
  12. Approval of Public and Private Swimming Pool Drawings
  13. Structural License for Roof and/or Pole Advertisement
  14. No Objection Certificate or NOC for Well Drilling
  15. Night Works Permit in Under Construction Projects
  16. Resolution of Technical Disputes
  17. Sand Supply Permit
  18. Approved Engineering Drawings Copy
  19. Temporary Electricity Supply for Construction Sites
  20. No Objection Letter to Add New Meter or to Increase Electricity Current
  21. Gate Level of a Building Entrance
  22. Painting and Maintenance permit
  23. Extend the Validity of Approved Drawings
  24. Renewing a Construction License
  25. New Building Permit
  26. Preliminary approval for New building, Additions, or Adjustment
  27. Site Preparation and Excavation Permit
  28. Test Samples of Construction Materials
  29. Historical Areas Building Maintenance Permit 
  30. Apply for approval to Design a Building in Historical Areas

 

Dubai Municipality Approvals Process:

The procedure for obtaining Dubai Municipality Approval can differ based on the particular requirements for which you are requesting approval. However, the majority of the DM approval process has some general steps that are common, such as the following:

Determine the relevant department: The first step in the Dubai Municipality approval process is finding the relevant department that is in charge of checking and processing your application.

Submit the application form: Once you have found the relevant approval process department, you need to submit the application form to process your dm approval.

Pay Application Fees: You need to pay the required amount along with the application form. The amount varies depending on the requirements that you are submitting for approval.

Submit the supporting documents.: You will also be required to submit some necessary supporting documents along with the application form and payment. The supporting documents vary according to the requirements for which you are applying for approval.

Await the Dubai Municipality's team response: After applying along with the necessary supporting documents, the Dubai Municipality team will check your application and issue a determination. The complexity of your application may affect how long it takes the Dubai Municipality team to respond.

Get Your Approval: A certificate of approval will be issued to you if your application is accepted. Usually, this certificate has a one-year expiration date and needs to be renewed every year.

 

Here Are Some Tips For Getting Approval From Dubai Municipality:

Before submitting your application, make sure you have all the necessary supporting documents. This will make it more likely that your application will be processed quickly and effectively.

Be ready to respond to any inquiries regarding your application that the Dubai Municipality may have. It's better to have a clear idea of the requirements for which you need approval.  The approval procedure with the Dubai Municipality can be lengthy, particularly in cases of complicated applications.

Please check for other types of Dubai approvals for further assistance.

To get DM approval provided by the Dubai Municipality Portal, or DM Dubai, please visit our DM Approvals Team. We can also help you know all the approvals provided by the Dubai Municipality here. You can Contact Us for any of your queries.